Willamette River Bridge

This I-5: Willamette River Bridge is located in Eugene/Springfield, Oregon, and is contracted under Construction Manager/General Contractor (CM/GC) method. Slayden was partnered with Hamilton Construction Company as the Construction Manager (CM). The project consisted of replacing the decommissioned bridge over the Willamette River and removing the detour bridge that was commissioned in 2004. The new…

Read More

Chemult Station

The Chemult Station is located in Chemult, Oregon. The new station features covered area for passengers, stair and ramp walk way, restroom space, visitor information kiosk, and a new ADA-compliant platform. Completed Total Project Value: $1.2 million Delivery Methods: Design Bid Build Owner: AMTRAK National Railroad Passenger Corporation

Read More

Sellwood Bridge Replacement

Slayden teamed up with Sundt Construction in a joint venture to provide Multnomah County the Sellwood Bridge Replacement project. This project involved replacing the 2,000-foot-long, aging Sellwood Bridge over the Willamette River. The existing steel bridge was shifted to the North and placed on temporary pillars for use as a detour. This innovative approach allows…

Read More

OR 38: Elk Creek to Hardscrabble Creek

This $47 MM design build multi-discipline highway project consisted of the design and replacement of five bridges over environmentally sensitive waterways in multiple work zones along OR 38. The project also included upgrades to the OR 38/OR 138 intersection. The project stretched over a 14-mile section of OR 38 between the cities of Drain and…

Read More

US 101: Spencer Creek Bridge

This contract was for the replacement of the Spencer Creek Bridge located near Newport, Oregon, for Oregon Department of Transportation. The project was adjacent to Beverly Beach State Park and is part of a National Scenic Byway. Beverly Beach State Park is one of the most popular state parks in Oregon with more than 250,000…

Read More

Truckee Agriculture Inspection Station Relocation

At an elevation of 5,000 ft. above sea level in the Sierras, this $18 million heavy civil project for Caltrans/DGS consisted of constructing eight lanes of concrete paving on mainline, a new car inspection station, as well as, a new truck inspection station on I-80 near the environmentally sensitive Truckee River.  Crews worked through the…

Read More

I-5: Elkhead Road to OR 126: Knowles Creek Bridges

This $43 million design-build highway project consisted of the design and replacement of six bridges along with the repair of one other. The bridges span across live railroad tracks, county roads, and environmentally sensitive water ways in multiple work zones along the I-5 corridor and along Highway 126. As the design-builder, Slayden Construction was responsible…

Read More

Applegate River Bridges

This $4.5 million contract was for the replacement of the Palmerton and Cameron. The work consists of the replacement of two deteriorating structures on a new alignment with two new concrete structures. Palmerton Bridge is 310-feet long, consisting of 48-inch and 36-inch drilled shaft foundations, and 3 spans of pre-stressed-concrete beams with a cast-in-place concrete…

Read More