Newport Wastewater Treatment Plant

This project consisted of construction of a new 15 MGD wastewater influent headworks, aeration basin, two secondary clarifiers, hypochlorite disinfection, septage receiving, emergency power generator, sludge tank, solids building containing a sludge pump station, centrifuge sludge dewatering, and biosolids lime pasteurization system, operation building, and maintenance building to provide 30/30 effluent at maximum month average daily flow of 5 MGD. The plant was constructed on a new eight-acre site that required clearing and grading. All piping in and out of the pump station was below the water table.

Total Project Value: $22,551,000

Slayden Construction Role: General Contractor

Owner: City of Newport

Serious About Safety

For over 30 years, we’ve dedicated ourselves to job site safety, and our track record of success speaks for itself.

Construct Your Future

Slayden is always looking for talented, experienced team players whether it be out on the field or in our corporate office. Start your future with Slayden by applying today!

Select Slayden Projects

Slayden is keeping busy! Check out our projects throughout the last 33 years.