This project was an expansion to the Treatment Plant for the City of Stayton. The project included construction of a new selector cell, filter structure, sludge drying and storage building, sludge storage tank, UV building over existing open channels and a shop. Specific new equipment included a sludge dryer, three-belt belt filter press, odor control unit, cooling tower, floating aerator, submersible mixer, three bays of cloth filters, screw conveyor and belt conveyor. Equipment was removed and replaced under strict shutdown requirements in order to keep the existing plant’s processes operational.

  • Total Project Value: $8.9 million
  • Delivery Methods: CM/GC
  • Owner: City of Stayton

Serious About Safety

For over 30 years, we’ve dedicated ourselves to job site safety, and our track record of success speaks for itself.

Construct Your Future

Slayden is always looking for talented, experienced team players whether it be out on the field or in our corporate office. Start your future with Slayden by applying today!

Select Slayden Projects

Slayden is keeping busy! Check out our projects throughout the last 33 years.