Tri-City Water Pollution Control Plant Phase 1

The Tri-City Phase 1 Expansion includes, but is not limited to, an intermediate pumping station, fine screening, aeration basin, blower building, membrane building, ultraviolet (UV) disinfection system, chemical system, galleries, and ancillary systems to expand the designated activated sludge treatment plant by 4.0 million gallons per day (MGD) average day flow/10.0 MGD peak hour flow with a MBR treatment system. This $80 Million CM/GC alternative delivery project includes approximately 16,000 CY of structural concrete, 95,000 CY of excavation for structures, and 40,000 CY of backfill. The mechanical package includes over 35 pumps ranging in size from 4” to 30,” over a mile of 4” and larger exposed process piping routed through galleries, over 200 valves ranging in size from 4” through 30,” and installation of a new submerged membrane system. This “green” project includes green roofs, permeable pavement, an underground storage system, and heat recovery systems.

Total Project Value: $79.8 million

Slayden Construction Role: Construction Manager/General Contractor

Owner: Water Environmental Services

Serious About Safety

For over 30 years, we’ve dedicated ourselves to job site safety, and our track record of success speaks for itself.

Construct Your Future

Slayden is always looking for talented, experienced team players whether it be out on the field or in our corporate office. Start your future with Slayden by applying today!

Select Slayden Projects

Slayden is keeping busy! Check out our projects throughout the last 33 years.