Judah Lodge Expansion

The 12,000 sf renovation of a ski lodge located 7,000’ in the Sierra Mountains including a two story dining hall addition and 2,000 sf first aid room for urgent care. The project involved a high degree of architectural woodwork as all interior installations were constructed of exposed woodwork. The project was completed in a very…

Read More

Applegate River Bridges

This $4.5 million contract was for the replacement of the Palmerton and Cameron. The work consists of the replacement of two deteriorating structures on a new alignment with two new concrete structures. Palmerton Bridge is 310-feet long, consisting of 48-inch and 36-inch drilled shaft foundations, and 3 spans of pre-stressed-concrete beams with a cast-in-place concrete…

Read More

Ashland Wastewater Treatment Filtration Building

The City of Ashland was required to remove the majority of the phosphorous from its effluent outfall being sent to Ashland creek. The two-story building consisted of a concrete lower structure, housing pumps and tanks on the dry side and Zenon filters on the wet side. The upper structure, built out of CMU and structural…

Read More

Newport Water Treatment Plant

Slayden was selected as the CM/GC Contractor for reconstruction of the Newport Water Treatment Facility. Slayden provided preconstruction services assisting the owner and engineer with value engineering and constructability recommendations as the project progressed from 25% design to the 100% design. The project includes construction of a new Pall Membrane Filtration Process capable of producing…

Read More

Roseburg High School Additions

Phase I involved construction of an 80,000 SF student center and auditorium.  This building houses  all arts, humanities, band, choir, food services and the new performing arts center. Sitework in Phase I involved construction of two courtyard areas, reconstruction of existing parking lots and construction of new parking lots at the west side of the…

Read More