Chiloquin Dam Removal MPID Pumping Plant and Fish Screen

Improving the spawning habitat for endangered short-nosed and Lost River sucker fish drove the Chiloquin Dam removal project. This project was constructed in two phases. The first phase was construction, startup, and commissioning of an intake structure with seven fish screens, a pumping plant with two 200 HP pumps, and 1,500’ of 42” piping. Phase…

Read More

Row River Water Treatment Plant

This project was a design-build contract for the City of Cottage Grove. The existing system was located at two sites that were more than twenty miles apart with a capacity of approximately two MGD. Our team converted the existing Row River site to a pall membrane system capable of uninterrupted deliveries of four MGD with…

Read More