Clovis Surface Water Treatment Plant Expansion

The Clovis Surface Water Treatment Plant project is located in Clovis, California. The reason for this project was to expand the capacity of the plant to 22.5 MGD. This included, but not limited to, site work, demolition of the existing concrete pads as well as a portion of the existing Pall membrane units. This project required the construction, installation, start-up and commissioning of all systems associated with the membrane building.

  • Total Project Value: $1.4 million
  • Delivery Methods: Design Bid Build
  • Owner: City of Clovis

Serious About Safety