Willamette River Bridge

This I-5: Willamette River Bridge is located in Eugene/Springfield, Oregon, and is contracted under Construction Manager/General Contractor (CM/GC) method. Slayden was partnered with Hamilton Construction Company as the Construction Manager (CM). The project consisted of replacing the decommissioned bridge over the Willamette River and removing the detour bridge that was commissioned in 2004. The new bridge required that the mainline I-5 profile be raised, which translated into raising the on and off ramps to match. The project also included the reconstruction of the Canoe Canal Bridges, various MSE retaining walls, soundwalls, AC and reinforced concrete paving, traffic control, and various other highway appurtenances.

  • Total Project Value: $120 million
  • Delivery Methods: CM/GC
  • Owner: Oregon Department of Transportation

Serious About Safety

For over 30 years, we’ve dedicated ourselves to job site safety, and our track record of success speaks for itself.

Construct Your Future

Slayden is always looking for talented, experienced team players whether it be out on the field or in our corporate office. Start your future with Slayden by applying today!

Select Slayden Projects

Slayden is keeping busy! Check out our projects throughout the last 33 years.